almalki
New Projects Awarded
  • Hotel Tower project (41 storey) at West Bay
  • Kahramaa Substations Project – 66/11KV and 132/11KV Substations under Kahramaa Phase-11 power expansion programme
  • Barracks Development Project
Hotel Tower project (41 storey) at West Bay

Arabian MEP has signed a contract directly with one of the largest listed real estate developer to carryout mechanical installations for a high-rise Hotel project at West Bay, consisting of three basements, ground floor, mezzanine and thirty six floors.

The Hotel will have total built up area of 60,000 Sq. Meter comprising 200 nos. Guest Rooms and 78 nos. Hotel Apartments including 44 nos. Single Bedrooms and 28 Nos. Double bedrooms and 6 Nos. Triple Bedrooms.

The targeted completion period for this fast track project including mobilization will be 28 months and the scope of works includes 2,400 TR of Central Chilled Water HVAC System out of which 2,000 TR to be drawn from available District Cooling Network and additional 400 TR capacity chillers to be installed as reserve capacity for future expansion.

HVAC System includes 2 nos. Heat exchangers, 2 nos. Chillers, primary and secondary chilled water pumps including duty and standby pumps, pressurization unit, expansion tank, automatic chemical dosing system, air separator, treated fresh air handling units, energy recovery units, air handling units and 700 nos. fan coil units.



Contact Us
P.O. Box: 40688
1st Floor, Al Malki HQ Building,
New Al Mirqab, Jawaan Street,
Doha, Qatar
Home I About Us I Message I Policy I Projects I Careers I News & Events I Press Release I Contact
© Copyright 2013 - Arabian MEP Contracting - All rights reserved